Equipment is in Rough Position

11 Jan

The new boiler and indirect water heater are in their rough positions where they will be installed, a little tweaking will be required based on connections but they are just about in their new homes. I had hoped the boiler could go right against the wall but they deemed it a little risky in case anything ever happens to the waste pipe above or if it leaked and dripped down. They felt it safer for it not to be directly below it, plus it will have a little room to breathe and be a little easier to access for service.

20120111-123131.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s